AB 525 Port Readiness Plan
By Brooklyn Fox and Sarah Lehman - California State Lands Commission, July 7, 2023
Assembly Bill (AB) 525 (Chiu, Chapter 231, Statutes of 2021) was signed by the Governor in 2021 and requires the Californica Energy Commission (CEC), in coordination with the California Coastal Commission, Ocean Protection Council, State Lands Commission (CSLC), Office of Planning and Research, Department of Fish and Wildlife, Governor’s Office of Business and Economic Development, Independent System Operator, and Public Utilities Commission (and other relevant federal, state, and local agencies as needed) to develop a strategic plan (AB 525 Strategic Plan) for offshore wind development in federal waters by June 30, 2023.
On August 1, 2022, the CEC established a planning goal of 2 to 5 GW of offshore wind energy by 2030 and 25 GW by 2045 (Flint 2022). To meet these goals, the AB 525 Strategic Plan shall include, at a minimum, the following five chapters:
- Identification of sea space, including the findings and recommendations resulting from activities undertaken pursuant to Section 25991.2 of AB 525.
- Waterfront facilities improvements plan, including facilities that could support construction and staging of foundations, manufacturing of components, final assembly, and long-term operations and maintenance, pursuant to Section 25991.3 of AB 525. Economic and workforce development and identification of port space and infrastructure, including the plan developed pursuant to Section 25991.3 of AB 525.
- Transmission planning, including the findings resulting from activities undertaken pursuant to Section 25991.4 of AB 525.
- Permitting, including the findings resulting from activities undertaken pursuant to Section 25991.5 of AB 525.
- Potential impacts on coastal resources, fisheries, Native American and Indigenous peoples, and national defense, and strategies for addressing those potential impacts.
Per Section 25991.3 of AB 525, based on the sea spaces identified pursuant to Section 25991.2 of AB 525, the CEC, in coordination with relevant state and local agencies, must develop a plan to improve waterfront facilities that could support a range of floating offshore wind energy development activities, including construction and staging of foundations, manufacturing of components, final assembly, and long-term operations and maintenance facilities. The purpose of this AB 525 Port Readiness Plan is to perform a detailed assessment of the necessary investments in California ports to support offshore wind energy activities, including construction, assembly, and operations and maintenance. This report will inform the AB 525 Strategic Plan.
For more details, see: AB 525 Reports: Offshore Renewable Energy
Download a copy of this publication here (PDF).
Disclaimer: The views expressed here are not the official position of the IWW (or even the IWW’s EUC) and do not necessarily represent the views of anyone but the author.
The Fine Print I:
Disclaimer: The views expressed on this site are not the official position of the IWW (or even the IWW’s EUC) unless otherwise indicated and do not necessarily represent the views of anyone but the author’s, nor should it be assumed that any of these authors automatically support the IWW or endorse any of its positions.
Further: the inclusion of a link on our site (other than the link to the main IWW site) does not imply endorsement by or an alliance with the IWW. These sites have been chosen by our members due to their perceived relevance to the IWW EUC and are included here for informational purposes only. If you have any suggestions or comments on any of the links included (or not included) above, please contact us.
The Fine Print II:
Fair Use Notice: The material on this site is provided for educational and informational purposes. It may contain copyrighted material the use of which has not always been specifically authorized by the copyright owner. It is being made available in an effort to advance the understanding of scientific, environmental, economic, social justice and human rights issues etc.
It is believed that this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have an interest in using the included information for research and educational purposes. If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. The information on this site does not constitute legal or technical advice.